UID:other-env-statement-form-v@FY2025-26@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20260930
DTEND;VALUE=DATE:20261001
SUMMARY:ENV STATEMENT due - FY 2025-26
DESCRIPTION:Environmental Statement (Form V) to SPCB - FY 2025-26\nLaw: Rul
 e 14 and Form V\, Environment (Protection) Rules 1986 (inserted by G.S.R. 
 329(E) dated 13-03-1992\; substituted by G.S.R. 386(E) dated 22-04-1993)\;
  Section 15\, Environment (Protection) Act 1986\nIf 30 days late: Rs 3\,10
 \,000\nSource: https://hspcb.org.in/uploads/ep_act_rules/eprotect_rules_19
 86.pdf\nDetails: https://dgomesbr.github.io/india-compliance-calendar/o/ot
 her-env-statement-form-v/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-env-statem
 ent-form-v/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:ENV STATEMENT due - FY 2025-26
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:ENV STATEMENT due - FY 2025-26
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-rera-annual-audit-form5@FY2025-26@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20260930
DTEND;VALUE=DATE:20261001
SUMMARY:RERA FORM 5 due - FY 2025-26
DESCRIPTION:RERA annual audited statement of accounts (Form 5) - FY 2025-26
 \nLaw: Section 4(2)(l)(D)\, Real Estate (Regulation and Development) Act 2
 016\, read with state RERA rules\; e.g. Goa RERA circular F.No.3/RERA/Off.
 Matters/2019/40 dated 10-01-2020\nIf 30 days late: Penalty up to 5 percent
  of estimated project cost (Section 60 RERA Act)\nSource: https://rera.goa
 .gov.in/Commonimage?IMG_PATH=5/0WkPfo5LroVL2qNvJBHg==\nDetails: https://dg
 omesbr.github.io/india-compliance-calendar/o/other-rera-annual-audit-form5
 /\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-rera-annua
 l-audit-form5/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA FORM 5 due - FY 2025-26
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA FORM 5 due - FY 2025-26
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-rera-quarterly-update@FY2026-27-Q2@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20261015
DTEND;VALUE=DATE:20261016
SUMMARY:RERA QPR due - Q2 FY 2026-27 (Jul-Sep)
DESCRIPTION:RERA quarterly project update by promoter - Q2 FY 2026-27 (Jul-
 Sep)\nLaw: Section 11(1)\, Real Estate (Regulation and Development) Act 20
 16\, read with state RERA rules and regulations (e.g. rule 14\, Haryana Re
 al Estate (Regulation and Development) Rules 2017 and HRERA Gurugram (Quar
 terly Progress Report) Regulations 2018)\nIf 30 days late: Penalty up to 5
  percent of estimated project cost (Section 61 RERA Act)\nSource: https://
 haryanarera.gov.in/regulations/Quarterly_Progress_ReportGURUGRAMRegulation
 s2018.pdf\nDetails: https://dgomesbr.github.io/india-compliance-calendar/o
 /other-rera-quarterly-update/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-rera-quart
 erly-update/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA QPR due - Q2 FY 2026-27 (Jul-Sep)
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA QPR due - Q2 FY 2026-27 (Jul-Sep)
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-ewaste-quarterly-return@FY2026-27-Q2@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20261031
DTEND;VALUE=DATE:20261101
SUMMARY:EPR E-WASTE Q due - Q2 FY 2026-27 (Jul-Sep)
DESCRIPTION:E-waste EPR quarterly return (CPCB portal) - Q2 FY 2026-27 (Jul
 -Sep)\nLaw: Rules 5(3)\, 6(4)\, 7(4)\, 9(6)\, 13 and 15(2) and (6)\, E-Was
 te (Management) Rules 2022 (G.S.R. 801(E))\; rule 9A (G.S.R. 164(E)\, 2024
 )\nIf 30 days late: Rs 3\,10\,000\nSource: https://cpcb.nic.in/uploads/Pro
 jects/E-Waste/e-waste_rules_2022.pdf\nDetails: https://dgomesbr.github.io/
 india-compliance-calendar/o/other-ewaste-quarterly-return/\nInformation on
 ly\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-ewaste-qua
 rterly-return/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE Q due - Q2 FY 2026-27 (Jul-Sep)
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE Q due - Q2 FY 2026-27 (Jul-Sep)
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-epr-plastic-annual-return@FY2025-26@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20261231
DTEND;VALUE=DATE:20270101
SUMMARY:EPR PLASTIC due - FY 2025-26 (extended)
DESCRIPTION:Plastic packaging EPR annual return (PIBOs) - FY 2025-26\nExten
 ded from 2026-06-30: Extended for registered PIBOs as a special case by Mo
 EFCC (HSM Division) Office Memorandum F.No. 12/64/2023-HSM Part (1) dated 
 28-08-2026\nLaw: Para 10.6\, Guidelines on Extended Producer Responsibilit
 y for Plastic Packaging (Schedule II\, Plastic Waste Management Rules 2016
 )\, inserted by the PWM (Amendment) Rules 2022\, G.S.R. 133(E) dated 16-02
 -2022\; Section 15\, Environment (Protection) Act 1986\nIf 30 days late: R
 s 3\,10\,000\nSource: https://cpcb.nic.in/uploads/plasticwaste/PWM-Amendme
 nt-Rules-2022.pdf\nDetails: https://dgomesbr.github.io/india-compliance-ca
 lendar/o/other-epr-plastic-annual-return/\nInformation only\, not legal ad
 vice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-epr-plasti
 c-annual-return/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR PLASTIC due - FY 2025-26 (extended)
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR PLASTIC due - FY 2025-26 (extended)
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-rera-quarterly-update@FY2026-27-Q3@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20270115
DTEND;VALUE=DATE:20270116
SUMMARY:RERA QPR due - Q3 FY 2026-27 (Oct-Dec)
DESCRIPTION:RERA quarterly project update by promoter - Q3 FY 2026-27 (Oct-
 Dec)\nLaw: Section 11(1)\, Real Estate (Regulation and Development) Act 20
 16\, read with state RERA rules and regulations (e.g. rule 14\, Haryana Re
 al Estate (Regulation and Development) Rules 2017 and HRERA Gurugram (Quar
 terly Progress Report) Regulations 2018)\nIf 30 days late: Penalty up to 5
  percent of estimated project cost (Section 61 RERA Act)\nSource: https://
 haryanarera.gov.in/regulations/Quarterly_Progress_ReportGURUGRAMRegulation
 s2018.pdf\nDetails: https://dgomesbr.github.io/india-compliance-calendar/o
 /other-rera-quarterly-update/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-rera-quart
 erly-update/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA QPR due - Q3 FY 2026-27 (Oct-Dec)
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA QPR due - Q3 FY 2026-27 (Oct-Dec)
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-ewaste-quarterly-return@FY2026-27-Q3@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20270131
DTEND;VALUE=DATE:20270201
SUMMARY:EPR E-WASTE Q due - Q3 FY 2026-27 (Oct-Dec)
DESCRIPTION:E-waste EPR quarterly return (CPCB portal) - Q3 FY 2026-27 (Oct
 -Dec)\nLaw: Rules 5(3)\, 6(4)\, 7(4)\, 9(6)\, 13 and 15(2) and (6)\, E-Was
 te (Management) Rules 2022 (G.S.R. 801(E))\; rule 9A (G.S.R. 164(E)\, 2024
 )\nIf 30 days late: Rs 3\,10\,000\nSource: https://cpcb.nic.in/uploads/Pro
 jects/E-Waste/e-waste_rules_2022.pdf\nDetails: https://dgomesbr.github.io/
 india-compliance-calendar/o/other-ewaste-quarterly-return/\nInformation on
 ly\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-ewaste-qua
 rterly-return/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE Q due - Q3 FY 2026-27 (Oct-Dec)
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE Q due - Q3 FY 2026-27 (Oct-Dec)
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-posh-ic-annual-report@CY2026@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20270131
DTEND;VALUE=DATE:20270201
SUMMARY:POSH due - CY 2026
DESCRIPTION:POSH Internal Committee annual report - CY 2026\nLaw: Sections 
 21\, 22 and 26\, Sexual Harassment of Women at Workplace (Prevention\, Pro
 hibition and Redressal) Act 2013\; Rule 14\, Sexual Harassment of Women at
  Workplace (Prevention\, Prohibition and Redressal) Rules 2013\nIf 30 days
  late: Rs 50\,000\nSource: https://www.wcd.gov.in/documents/uploaded/17102
 19823.pdf\nDetails: https://dgomesbr.github.io/india-compliance-calendar/o
 /other-posh-ic-annual-report/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-posh-ic-an
 nual-report/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:POSH due - CY 2026
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:POSH due - CY 2026
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-rera-quarterly-update@FY2026-27-Q4@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20270415
DTEND;VALUE=DATE:20270416
SUMMARY:RERA QPR due - Q4 FY 2026-27 (Jan-Mar)
DESCRIPTION:RERA quarterly project update by promoter - Q4 FY 2026-27 (Jan-
 Mar)\nLaw: Section 11(1)\, Real Estate (Regulation and Development) Act 20
 16\, read with state RERA rules and regulations (e.g. rule 14\, Haryana Re
 al Estate (Regulation and Development) Rules 2017 and HRERA Gurugram (Quar
 terly Progress Report) Regulations 2018)\nIf 30 days late: Penalty up to 5
  percent of estimated project cost (Section 61 RERA Act)\nSource: https://
 haryanarera.gov.in/regulations/Quarterly_Progress_ReportGURUGRAMRegulation
 s2018.pdf\nDetails: https://dgomesbr.github.io/india-compliance-calendar/o
 /other-rera-quarterly-update/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-rera-quart
 erly-update/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA QPR due - Q4 FY 2026-27 (Jan-Mar)
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA QPR due - Q4 FY 2026-27 (Jan-Mar)
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-ewaste-annual-return@FY2026-27@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20270430
DTEND;VALUE=DATE:20270501
SUMMARY:EPR E-WASTE due - FY 2026-27
DESCRIPTION:E-waste EPR annual return (CPCB portal) - FY 2026-27\nLaw: Rule
 s 5(3)\, 6(4)\, 7(4) and 9(6)\, E-Waste (Management) Rules 2022 (G.S.R. 80
 1(E)\, 2-11-2022)\; rule 9A inserted by the E-Waste (Management) Amendment
  Rules 2024 (G.S.R. 164(E)\, 8-03-2024)\; rules 22 and 23\nIf 30 days late
 : Rs 3\,10\,000\nSource: https://cpcb.nic.in/uploads/Projects/E-Waste/e-wa
 ste_rules_2022.pdf\nDetails: https://dgomesbr.github.io/india-compliance-c
 alendar/o/other-ewaste-annual-return/\nInformation only\, not legal advice
 .
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-ewaste-ann
 ual-return/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE due - FY 2026-27
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE due - FY 2026-27
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-ewaste-quarterly-return@FY2026-27-Q4@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20270430
DTEND;VALUE=DATE:20270501
SUMMARY:EPR E-WASTE Q due - Q4 FY 2026-27 (Jan-Mar)
DESCRIPTION:E-waste EPR quarterly return (CPCB portal) - Q4 FY 2026-27 (Jan
 -Mar)\nLaw: Rules 5(3)\, 6(4)\, 7(4)\, 9(6)\, 13 and 15(2) and (6)\, E-Was
 te (Management) Rules 2022 (G.S.R. 801(E))\; rule 9A (G.S.R. 164(E)\, 2024
 )\nIf 30 days late: Rs 3\,10\,000\nSource: https://cpcb.nic.in/uploads/Pro
 jects/E-Waste/e-waste_rules_2022.pdf\nDetails: https://dgomesbr.github.io/
 india-compliance-calendar/o/other-ewaste-quarterly-return/\nInformation on
 ly\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-ewaste-qua
 rterly-return/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE Q due - Q4 FY 2026-27 (Jan-Mar)
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE Q due - Q4 FY 2026-27 (Jan-Mar)
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-fssai-annual-return-d1@FY2026-27@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20270531
DTEND;VALUE=DATE:20270601
SUMMARY:FSSAI D-1 due - FY 2026-27
DESCRIPTION:FSSAI annual return (Form D-1) on FoSCoS - FY 2026-27\nLaw: Reg
 ulation 2.1.13\, Food Safety and Standards (Licensing and Registration of 
 Food Businesses) Regulations 2011\, as applied by FSSAI orders dated 18-12
 -2020 and 10-11-2022\; Regulation 2.1.7(2) as substituted by the FSS (Lice
 nsing and Registration of Food Businesses) Amendment Regulations 2026 (not
 ified 10-03-2026)\nIf 30 days late: Rs 3\,000\nSource: https://www.fssai.g
 ov.in/upload/uploadfiles/files/Compendium_Licensing_Regulations.pdf\nDetai
 ls: https://dgomesbr.github.io/india-compliance-calendar/o/other-fssai-ann
 ual-return-d1/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-fssai-annu
 al-return-d1/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:FSSAI D-1 due - FY 2026-27
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:FSSAI D-1 due - FY 2026-27
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-battery-epr-annual-return@FY2026-27@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20270630
DTEND;VALUE=DATE:20270701
SUMMARY:EPR BATTERY due - FY 2026-27
DESCRIPTION:Battery EPR annual return (Form 3) and Form 1(C) - FY 2026-27\n
 Law: Rules 4(2)\, 4(7) and 4(11)\, Battery Waste Management Rules 2022 (S.
 O. 3984(E))\, as amended by S.O. 4669(E) dated 25-10-2023\; rule 14(6) (re
 laxation)\; rule 13 (environmental compensation)\nIf 30 days late: Rs 3\,1
 0\,000\nSource: https://cpcb.nic.in/uploads/hwmd/Battery-WasteManagementRu
 les-2022.pdf\nDetails: https://dgomesbr.github.io/india-compliance-calenda
 r/o/other-battery-epr-annual-return/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-battery-ep
 r-annual-return/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR BATTERY due - FY 2026-27
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR BATTERY due - FY 2026-27
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-bmw-annual-report-form-iv@CY2026@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20270630
DTEND;VALUE=DATE:20270701
SUMMARY:BMW FORM IV due - CY 2026
DESCRIPTION:Bio-medical waste annual report (Form IV) - CY 2026\nLaw: Rule 
 13(1) and Form IV\, Bio-Medical Waste Management Rules 2016 (G.S.R. 343(E)
 \, 28-03-2016)\, as amended in 2018\, 2019 and by G.S.R. 293(E) dated 17-0
 4-2026\; rule 18\nIf 30 days late: Rs 3\,10\,000\nSource: https://cpcb.nic
 .in/uploads/Projects/Bio-Medical-Waste/Bio-medical_Waste_Management_Rules_
 2016.pdf\nDetails: https://dgomesbr.github.io/india-compliance-calendar/o/
 other-bmw-annual-report-form-iv/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-bmw-annual
 -report-form-iv/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:BMW FORM IV due - CY 2026
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:BMW FORM IV due - CY 2026
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-epr-plastic-annual-return@FY2026-27@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20270630
DTEND;VALUE=DATE:20270701
SUMMARY:EPR PLASTIC due - FY 2026-27
DESCRIPTION:Plastic packaging EPR annual return (PIBOs) - FY 2026-27\nLaw: 
 Para 10.6\, Guidelines on Extended Producer Responsibility for Plastic Pac
 kaging (Schedule II\, Plastic Waste Management Rules 2016)\, inserted by t
 he PWM (Amendment) Rules 2022\, G.S.R. 133(E) dated 16-02-2022\; Section 1
 5\, Environment (Protection) Act 1986\nIf 30 days late: Rs 3\,10\,000\nSou
 rce: https://cpcb.nic.in/uploads/plasticwaste/PWM-Amendment-Rules-2022.pdf
 \nDetails: https://dgomesbr.github.io/india-compliance-calendar/o/other-ep
 r-plastic-annual-return/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-epr-plasti
 c-annual-return/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR PLASTIC due - FY 2026-27
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR PLASTIC due - FY 2026-27
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-hazardous-waste-annual-return@FY2026-27@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20270630
DTEND;VALUE=DATE:20270701
SUMMARY:HW FORM 4 due - FY 2026-27
DESCRIPTION:Hazardous waste annual return (Form 4) to SPCB - FY 2026-27\nLa
 w: Rules 6(5)\, 13(8)\, 16(6) and 20(2)\, Hazardous and Other Wastes (Mana
 gement and Transboundary Movement) Rules 2016 (G.S.R. 395(E)\, 4-04-2016)\
 ; rule 40 as substituted by G.S.R. 698(E) dated 12-11-2024\nIf 30 days lat
 e: Rs 3\,10\,000\nSource: https://cpcb.nic.in/uploads/hwmd/HWM_Rules_2016.
 pdf\nDetails: https://dgomesbr.github.io/india-compliance-calendar/o/other
 -hazardous-waste-annual-return/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-hazardous-
 waste-annual-return/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:HW FORM 4 due - FY 2026-27
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:HW FORM 4 due - FY 2026-27
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-swm-bulk-waste-generator-annual-return@FY2026-27@india-compliance
 -calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20270630
DTEND;VALUE=DATE:20270701
SUMMARY:SWM BULK due - FY 2026-27
DESCRIPTION:Bulk waste generator annual return (SWM Rules 2026) - FY 2026-2
 7\nLaw: Rule 6(a) and 6(h)\, Solid Waste Management Rules 2026 (S.O. 388(E
 ) dated 27-01-2026)\, in force 1-04-2026\; rule 17 (environmental compensa
 tion)\nIf 30 days late: Environmental compensation per CPCB guidelines und
 er rule 17\nSource: https://cpcb.nic.in/uploads/MSW/SWM_2026.pdf\nDetails:
  https://dgomesbr.github.io/india-compliance-calendar/o/other-swm-bulk-was
 te-generator-annual-return/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-swm-bulk-w
 aste-generator-annual-return/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:SWM BULK due - FY 2026-27
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:SWM BULK due - FY 2026-27
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-rera-quarterly-update@FY2027-28-Q1@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20270715
DTEND;VALUE=DATE:20270716
SUMMARY:RERA QPR due - Q1 FY 2027-28 (Apr-Jun)
DESCRIPTION:RERA quarterly project update by promoter - Q1 FY 2027-28 (Apr-
 Jun)\nProjected from the standing rule\; confirm closer to the date.\nLaw:
  Section 11(1)\, Real Estate (Regulation and Development) Act 2016\, read 
 with state RERA rules and regulations (e.g. rule 14\, Haryana Real Estate 
 (Regulation and Development) Rules 2017 and HRERA Gurugram (Quarterly Prog
 ress Report) Regulations 2018)\nIf 30 days late: Penalty up to 5 percent o
 f estimated project cost (Section 61 RERA Act)\nSource: https://haryanarer
 a.gov.in/regulations/Quarterly_Progress_ReportGURUGRAMRegulations2018.pdf\
 nDetails: https://dgomesbr.github.io/india-compliance-calendar/o/other-rer
 a-quarterly-update/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-rera-quart
 erly-update/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA QPR due - Q1 FY 2027-28 (Apr-Jun)
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA QPR due - Q1 FY 2027-28 (Apr-Jun)
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-ewaste-quarterly-return@FY2027-28-Q1@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20270731
DTEND;VALUE=DATE:20270801
SUMMARY:EPR E-WASTE Q due - Q1 FY 2027-28 (Apr-Jun)
DESCRIPTION:E-waste EPR quarterly return (CPCB portal) - Q1 FY 2027-28 (Apr
 -Jun)\nProjected from the standing rule\; confirm closer to the date.\nLaw
 : Rules 5(3)\, 6(4)\, 7(4)\, 9(6)\, 13 and 15(2) and (6)\, E-Waste (Manage
 ment) Rules 2022 (G.S.R. 801(E))\; rule 9A (G.S.R. 164(E)\, 2024)\nIf 30 d
 ays late: Rs 3\,10\,000\nSource: https://cpcb.nic.in/uploads/Projects/E-Wa
 ste/e-waste_rules_2022.pdf\nDetails: https://dgomesbr.github.io/india-comp
 liance-calendar/o/other-ewaste-quarterly-return/\nInformation only\, not l
 egal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-ewaste-qua
 rterly-return/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE Q due - Q1 FY 2027-28 (Apr-Jun)
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE Q due - Q1 FY 2027-28 (Apr-Jun)
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-env-statement-form-v@FY2026-27@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20270930
DTEND;VALUE=DATE:20271001
SUMMARY:ENV STATEMENT due - FY 2026-27
DESCRIPTION:Environmental Statement (Form V) to SPCB - FY 2026-27\nProjecte
 d from the standing rule\; confirm closer to the date.\nLaw: Rule 14 and F
 orm V\, Environment (Protection) Rules 1986 (inserted by G.S.R. 329(E) dat
 ed 13-03-1992\; substituted by G.S.R. 386(E) dated 22-04-1993)\; Section 1
 5\, Environment (Protection) Act 1986\nIf 30 days late: Rs 3\,10\,000\nSou
 rce: https://hspcb.org.in/uploads/ep_act_rules/eprotect_rules_1986.pdf\nDe
 tails: https://dgomesbr.github.io/india-compliance-calendar/o/other-env-st
 atement-form-v/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-env-statem
 ent-form-v/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:ENV STATEMENT due - FY 2026-27
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:ENV STATEMENT due - FY 2026-27
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-rera-annual-audit-form5@FY2026-27@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20270930
DTEND;VALUE=DATE:20271001
SUMMARY:RERA FORM 5 due - FY 2026-27
DESCRIPTION:RERA annual audited statement of accounts (Form 5) - FY 2026-27
 \nProjected from the standing rule\; confirm closer to the date.\nLaw: Sec
 tion 4(2)(l)(D)\, Real Estate (Regulation and Development) Act 2016\, read
  with state RERA rules\; e.g. Goa RERA circular F.No.3/RERA/Off.Matters/20
 19/40 dated 10-01-2020\nIf 30 days late: Penalty up to 5 percent of estima
 ted project cost (Section 60 RERA Act)\nSource: https://rera.goa.gov.in/Co
 mmonimage?IMG_PATH=5/0WkPfo5LroVL2qNvJBHg==\nDetails: https://dgomesbr.git
 hub.io/india-compliance-calendar/o/other-rera-annual-audit-form5/\nInforma
 tion only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-rera-annua
 l-audit-form5/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA FORM 5 due - FY 2026-27
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA FORM 5 due - FY 2026-27
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-rera-quarterly-update@FY2027-28-Q2@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20271015
DTEND;VALUE=DATE:20271016
SUMMARY:RERA QPR due - Q2 FY 2027-28 (Jul-Sep)
DESCRIPTION:RERA quarterly project update by promoter - Q2 FY 2027-28 (Jul-
 Sep)\nProjected from the standing rule\; confirm closer to the date.\nLaw:
  Section 11(1)\, Real Estate (Regulation and Development) Act 2016\, read 
 with state RERA rules and regulations (e.g. rule 14\, Haryana Real Estate 
 (Regulation and Development) Rules 2017 and HRERA Gurugram (Quarterly Prog
 ress Report) Regulations 2018)\nIf 30 days late: Penalty up to 5 percent o
 f estimated project cost (Section 61 RERA Act)\nSource: https://haryanarer
 a.gov.in/regulations/Quarterly_Progress_ReportGURUGRAMRegulations2018.pdf\
 nDetails: https://dgomesbr.github.io/india-compliance-calendar/o/other-rer
 a-quarterly-update/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-rera-quart
 erly-update/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA QPR due - Q2 FY 2027-28 (Jul-Sep)
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA QPR due - Q2 FY 2027-28 (Jul-Sep)
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-ewaste-quarterly-return@FY2027-28-Q2@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20271031
DTEND;VALUE=DATE:20271101
SUMMARY:EPR E-WASTE Q due - Q2 FY 2027-28 (Jul-Sep)
DESCRIPTION:E-waste EPR quarterly return (CPCB portal) - Q2 FY 2027-28 (Jul
 -Sep)\nProjected from the standing rule\; confirm closer to the date.\nLaw
 : Rules 5(3)\, 6(4)\, 7(4)\, 9(6)\, 13 and 15(2) and (6)\, E-Waste (Manage
 ment) Rules 2022 (G.S.R. 801(E))\; rule 9A (G.S.R. 164(E)\, 2024)\nIf 30 d
 ays late: Rs 3\,10\,000\nSource: https://cpcb.nic.in/uploads/Projects/E-Wa
 ste/e-waste_rules_2022.pdf\nDetails: https://dgomesbr.github.io/india-comp
 liance-calendar/o/other-ewaste-quarterly-return/\nInformation only\, not l
 egal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-ewaste-qua
 rterly-return/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE Q due - Q2 FY 2027-28 (Jul-Sep)
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE Q due - Q2 FY 2027-28 (Jul-Sep)
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-rera-quarterly-update@FY2027-28-Q3@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20280115
DTEND;VALUE=DATE:20280116
SUMMARY:RERA QPR due - Q3 FY 2027-28 (Oct-Dec)
DESCRIPTION:RERA quarterly project update by promoter - Q3 FY 2027-28 (Oct-
 Dec)\nProjected from the standing rule\; confirm closer to the date.\nLaw:
  Section 11(1)\, Real Estate (Regulation and Development) Act 2016\, read 
 with state RERA rules and regulations (e.g. rule 14\, Haryana Real Estate 
 (Regulation and Development) Rules 2017 and HRERA Gurugram (Quarterly Prog
 ress Report) Regulations 2018)\nIf 30 days late: Penalty up to 5 percent o
 f estimated project cost (Section 61 RERA Act)\nSource: https://haryanarer
 a.gov.in/regulations/Quarterly_Progress_ReportGURUGRAMRegulations2018.pdf\
 nDetails: https://dgomesbr.github.io/india-compliance-calendar/o/other-rer
 a-quarterly-update/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-rera-quart
 erly-update/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA QPR due - Q3 FY 2027-28 (Oct-Dec)
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA QPR due - Q3 FY 2027-28 (Oct-Dec)
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-ewaste-quarterly-return@FY2027-28-Q3@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20280131
DTEND;VALUE=DATE:20280201
SUMMARY:EPR E-WASTE Q due - Q3 FY 2027-28 (Oct-Dec)
DESCRIPTION:E-waste EPR quarterly return (CPCB portal) - Q3 FY 2027-28 (Oct
 -Dec)\nProjected from the standing rule\; confirm closer to the date.\nLaw
 : Rules 5(3)\, 6(4)\, 7(4)\, 9(6)\, 13 and 15(2) and (6)\, E-Waste (Manage
 ment) Rules 2022 (G.S.R. 801(E))\; rule 9A (G.S.R. 164(E)\, 2024)\nIf 30 d
 ays late: Rs 3\,10\,000\nSource: https://cpcb.nic.in/uploads/Projects/E-Wa
 ste/e-waste_rules_2022.pdf\nDetails: https://dgomesbr.github.io/india-comp
 liance-calendar/o/other-ewaste-quarterly-return/\nInformation only\, not l
 egal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-ewaste-qua
 rterly-return/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE Q due - Q3 FY 2027-28 (Oct-Dec)
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE Q due - Q3 FY 2027-28 (Oct-Dec)
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-posh-ic-annual-report@CY2027@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20280131
DTEND;VALUE=DATE:20280201
SUMMARY:POSH due - CY 2027
DESCRIPTION:POSH Internal Committee annual report - CY 2027\nProjected from
  the standing rule\; confirm closer to the date.\nLaw: Sections 21\, 22 an
 d 26\, Sexual Harassment of Women at Workplace (Prevention\, Prohibition a
 nd Redressal) Act 2013\; Rule 14\, Sexual Harassment of Women at Workplace
  (Prevention\, Prohibition and Redressal) Rules 2013\nIf 30 days late: Rs 
 50\,000\nSource: https://www.wcd.gov.in/documents/uploaded/1710219823.pdf\
 nDetails: https://dgomesbr.github.io/india-compliance-calendar/o/other-pos
 h-ic-annual-report/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-posh-ic-an
 nual-report/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:POSH due - CY 2027
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:POSH due - CY 2027
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-rera-quarterly-update@FY2027-28-Q4@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20280415
DTEND;VALUE=DATE:20280416
SUMMARY:RERA QPR due - Q4 FY 2027-28 (Jan-Mar)
DESCRIPTION:RERA quarterly project update by promoter - Q4 FY 2027-28 (Jan-
 Mar)\nProjected from the standing rule\; confirm closer to the date.\nLaw:
  Section 11(1)\, Real Estate (Regulation and Development) Act 2016\, read 
 with state RERA rules and regulations (e.g. rule 14\, Haryana Real Estate 
 (Regulation and Development) Rules 2017 and HRERA Gurugram (Quarterly Prog
 ress Report) Regulations 2018)\nIf 30 days late: Penalty up to 5 percent o
 f estimated project cost (Section 61 RERA Act)\nSource: https://haryanarer
 a.gov.in/regulations/Quarterly_Progress_ReportGURUGRAMRegulations2018.pdf\
 nDetails: https://dgomesbr.github.io/india-compliance-calendar/o/other-rer
 a-quarterly-update/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-rera-quart
 erly-update/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA QPR due - Q4 FY 2027-28 (Jan-Mar)
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA QPR due - Q4 FY 2027-28 (Jan-Mar)
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-ewaste-annual-return@FY2027-28@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20280430
DTEND;VALUE=DATE:20280501
SUMMARY:EPR E-WASTE due - FY 2027-28
DESCRIPTION:E-waste EPR annual return (CPCB portal) - FY 2027-28\nProjected
  from the standing rule\; confirm closer to the date.\nLaw: Rules 5(3)\, 6
 (4)\, 7(4) and 9(6)\, E-Waste (Management) Rules 2022 (G.S.R. 801(E)\, 2-1
 1-2022)\; rule 9A inserted by the E-Waste (Management) Amendment Rules 202
 4 (G.S.R. 164(E)\, 8-03-2024)\; rules 22 and 23\nIf 30 days late: Rs 3\,10
 \,000\nSource: https://cpcb.nic.in/uploads/Projects/E-Waste/e-waste_rules_
 2022.pdf\nDetails: https://dgomesbr.github.io/india-compliance-calendar/o/
 other-ewaste-annual-return/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-ewaste-ann
 ual-return/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE due - FY 2027-28
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE due - FY 2027-28
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-ewaste-quarterly-return@FY2027-28-Q4@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20280430
DTEND;VALUE=DATE:20280501
SUMMARY:EPR E-WASTE Q due - Q4 FY 2027-28 (Jan-Mar)
DESCRIPTION:E-waste EPR quarterly return (CPCB portal) - Q4 FY 2027-28 (Jan
 -Mar)\nProjected from the standing rule\; confirm closer to the date.\nLaw
 : Rules 5(3)\, 6(4)\, 7(4)\, 9(6)\, 13 and 15(2) and (6)\, E-Waste (Manage
 ment) Rules 2022 (G.S.R. 801(E))\; rule 9A (G.S.R. 164(E)\, 2024)\nIf 30 d
 ays late: Rs 3\,10\,000\nSource: https://cpcb.nic.in/uploads/Projects/E-Wa
 ste/e-waste_rules_2022.pdf\nDetails: https://dgomesbr.github.io/india-comp
 liance-calendar/o/other-ewaste-quarterly-return/\nInformation only\, not l
 egal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-ewaste-qua
 rterly-return/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE Q due - Q4 FY 2027-28 (Jan-Mar)
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE Q due - Q4 FY 2027-28 (Jan-Mar)
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-fssai-annual-return-d1@FY2027-28@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20280531
DTEND;VALUE=DATE:20280601
SUMMARY:FSSAI D-1 due - FY 2027-28
DESCRIPTION:FSSAI annual return (Form D-1) on FoSCoS - FY 2027-28\nProjecte
 d from the standing rule\; confirm closer to the date.\nLaw: Regulation 2.
 1.13\, Food Safety and Standards (Licensing and Registration of Food Busin
 esses) Regulations 2011\, as applied by FSSAI orders dated 18-12-2020 and 
 10-11-2022\; Regulation 2.1.7(2) as substituted by the FSS (Licensing and 
 Registration of Food Businesses) Amendment Regulations 2026 (notified 10-0
 3-2026)\nIf 30 days late: Rs 3\,000\nSource: https://www.fssai.gov.in/uplo
 ad/uploadfiles/files/Compendium_Licensing_Regulations.pdf\nDetails: https:
 //dgomesbr.github.io/india-compliance-calendar/o/other-fssai-annual-return
 -d1/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-fssai-annu
 al-return-d1/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:FSSAI D-1 due - FY 2027-28
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:FSSAI D-1 due - FY 2027-28
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-battery-epr-annual-return@FY2027-28@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20280630
DTEND;VALUE=DATE:20280701
SUMMARY:EPR BATTERY due - FY 2027-28
DESCRIPTION:Battery EPR annual return (Form 3) and Form 1(C) - FY 2027-28\n
 Projected from the standing rule\; confirm closer to the date.\nLaw: Rules
  4(2)\, 4(7) and 4(11)\, Battery Waste Management Rules 2022 (S.O. 3984(E)
 )\, as amended by S.O. 4669(E) dated 25-10-2023\; rule 14(6) (relaxation)\
 ; rule 13 (environmental compensation)\nIf 30 days late: Rs 3\,10\,000\nSo
 urce: https://cpcb.nic.in/uploads/hwmd/Battery-WasteManagementRules-2022.p
 df\nDetails: https://dgomesbr.github.io/india-compliance-calendar/o/other-
 battery-epr-annual-return/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-battery-ep
 r-annual-return/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR BATTERY due - FY 2027-28
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR BATTERY due - FY 2027-28
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-bmw-annual-report-form-iv@CY2027@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20280630
DTEND;VALUE=DATE:20280701
SUMMARY:BMW FORM IV due - CY 2027
DESCRIPTION:Bio-medical waste annual report (Form IV) - CY 2027\nProjected 
 from the standing rule\; confirm closer to the date.\nLaw: Rule 13(1) and 
 Form IV\, Bio-Medical Waste Management Rules 2016 (G.S.R. 343(E)\, 28-03-2
 016)\, as amended in 2018\, 2019 and by G.S.R. 293(E) dated 17-04-2026\; r
 ule 18\nIf 30 days late: Rs 3\,10\,000\nSource: https://cpcb.nic.in/upload
 s/Projects/Bio-Medical-Waste/Bio-medical_Waste_Management_Rules_2016.pdf\n
 Details: https://dgomesbr.github.io/india-compliance-calendar/o/other-bmw-
 annual-report-form-iv/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-bmw-annual
 -report-form-iv/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:BMW FORM IV due - CY 2027
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:BMW FORM IV due - CY 2027
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-epr-plastic-annual-return@FY2027-28@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20280630
DTEND;VALUE=DATE:20280701
SUMMARY:EPR PLASTIC due - FY 2027-28
DESCRIPTION:Plastic packaging EPR annual return (PIBOs) - FY 2027-28\nProje
 cted from the standing rule\; confirm closer to the date.\nLaw: Para 10.6\
 , Guidelines on Extended Producer Responsibility for Plastic Packaging (Sc
 hedule II\, Plastic Waste Management Rules 2016)\, inserted by the PWM (Am
 endment) Rules 2022\, G.S.R. 133(E) dated 16-02-2022\; Section 15\, Enviro
 nment (Protection) Act 1986\nIf 30 days late: Rs 3\,10\,000\nSource: https
 ://cpcb.nic.in/uploads/plasticwaste/PWM-Amendment-Rules-2022.pdf\nDetails:
  https://dgomesbr.github.io/india-compliance-calendar/o/other-epr-plastic-
 annual-return/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-epr-plasti
 c-annual-return/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR PLASTIC due - FY 2027-28
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR PLASTIC due - FY 2027-28
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-hazardous-waste-annual-return@FY2027-28@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20280630
DTEND;VALUE=DATE:20280701
SUMMARY:HW FORM 4 due - FY 2027-28
DESCRIPTION:Hazardous waste annual return (Form 4) to SPCB - FY 2027-28\nPr
 ojected from the standing rule\; confirm closer to the date.\nLaw: Rules 6
 (5)\, 13(8)\, 16(6) and 20(2)\, Hazardous and Other Wastes (Management and
  Transboundary Movement) Rules 2016 (G.S.R. 395(E)\, 4-04-2016)\; rule 40 
 as substituted by G.S.R. 698(E) dated 12-11-2024\nIf 30 days late: Rs 3\,1
 0\,000\nSource: https://cpcb.nic.in/uploads/hwmd/HWM_Rules_2016.pdf\nDetai
 ls: https://dgomesbr.github.io/india-compliance-calendar/o/other-hazardous
 -waste-annual-return/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-hazardous-
 waste-annual-return/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:HW FORM 4 due - FY 2027-28
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:HW FORM 4 due - FY 2027-28
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-swm-bulk-waste-generator-annual-return@FY2027-28@india-compliance
 -calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20280630
DTEND;VALUE=DATE:20280701
SUMMARY:SWM BULK due - FY 2027-28
DESCRIPTION:Bulk waste generator annual return (SWM Rules 2026) - FY 2027-2
 8\nProjected from the standing rule\; confirm closer to the date.\nLaw: Ru
 le 6(a) and 6(h)\, Solid Waste Management Rules 2026 (S.O. 388(E) dated 27
 -01-2026)\, in force 1-04-2026\; rule 17 (environmental compensation)\nIf 
 30 days late: Environmental compensation per CPCB guidelines under rule 17
 \nSource: https://cpcb.nic.in/uploads/MSW/SWM_2026.pdf\nDetails: https://d
 gomesbr.github.io/india-compliance-calendar/o/other-swm-bulk-waste-generat
 or-annual-return/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-swm-bulk-w
 aste-generator-annual-return/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:SWM BULK due - FY 2027-28
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:SWM BULK due - FY 2027-28
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-rera-quarterly-update@FY2028-29-Q1@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20280715
DTEND;VALUE=DATE:20280716
SUMMARY:RERA QPR due - Q1 FY 2028-29 (Apr-Jun)
DESCRIPTION:RERA quarterly project update by promoter - Q1 FY 2028-29 (Apr-
 Jun)\nProjected from the standing rule\; confirm closer to the date.\nLaw:
  Section 11(1)\, Real Estate (Regulation and Development) Act 2016\, read 
 with state RERA rules and regulations (e.g. rule 14\, Haryana Real Estate 
 (Regulation and Development) Rules 2017 and HRERA Gurugram (Quarterly Prog
 ress Report) Regulations 2018)\nIf 30 days late: Penalty up to 5 percent o
 f estimated project cost (Section 61 RERA Act)\nSource: https://haryanarer
 a.gov.in/regulations/Quarterly_Progress_ReportGURUGRAMRegulations2018.pdf\
 nDetails: https://dgomesbr.github.io/india-compliance-calendar/o/other-rer
 a-quarterly-update/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-rera-quart
 erly-update/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA QPR due - Q1 FY 2028-29 (Apr-Jun)
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA QPR due - Q1 FY 2028-29 (Apr-Jun)
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-ewaste-quarterly-return@FY2028-29-Q1@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20280731
DTEND;VALUE=DATE:20280801
SUMMARY:EPR E-WASTE Q due - Q1 FY 2028-29 (Apr-Jun)
DESCRIPTION:E-waste EPR quarterly return (CPCB portal) - Q1 FY 2028-29 (Apr
 -Jun)\nProjected from the standing rule\; confirm closer to the date.\nLaw
 : Rules 5(3)\, 6(4)\, 7(4)\, 9(6)\, 13 and 15(2) and (6)\, E-Waste (Manage
 ment) Rules 2022 (G.S.R. 801(E))\; rule 9A (G.S.R. 164(E)\, 2024)\nIf 30 d
 ays late: Rs 3\,10\,000\nSource: https://cpcb.nic.in/uploads/Projects/E-Wa
 ste/e-waste_rules_2022.pdf\nDetails: https://dgomesbr.github.io/india-comp
 liance-calendar/o/other-ewaste-quarterly-return/\nInformation only\, not l
 egal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-ewaste-qua
 rterly-return/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE Q due - Q1 FY 2028-29 (Apr-Jun)
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EPR E-WASTE Q due - Q1 FY 2028-29 (Apr-Jun)
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-env-statement-form-v@FY2027-28@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20280930
DTEND;VALUE=DATE:20281001
SUMMARY:ENV STATEMENT due - FY 2027-28
DESCRIPTION:Environmental Statement (Form V) to SPCB - FY 2027-28\nProjecte
 d from the standing rule\; confirm closer to the date.\nLaw: Rule 14 and F
 orm V\, Environment (Protection) Rules 1986 (inserted by G.S.R. 329(E) dat
 ed 13-03-1992\; substituted by G.S.R. 386(E) dated 22-04-1993)\; Section 1
 5\, Environment (Protection) Act 1986\nIf 30 days late: Rs 3\,10\,000\nSou
 rce: https://hspcb.org.in/uploads/ep_act_rules/eprotect_rules_1986.pdf\nDe
 tails: https://dgomesbr.github.io/india-compliance-calendar/o/other-env-st
 atement-form-v/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-env-statem
 ent-form-v/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:ENV STATEMENT due - FY 2027-28
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:ENV STATEMENT due - FY 2027-28
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-rera-annual-audit-form5@FY2027-28@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20280930
DTEND;VALUE=DATE:20281001
SUMMARY:RERA FORM 5 due - FY 2027-28
DESCRIPTION:RERA annual audited statement of accounts (Form 5) - FY 2027-28
 \nProjected from the standing rule\; confirm closer to the date.\nLaw: Sec
 tion 4(2)(l)(D)\, Real Estate (Regulation and Development) Act 2016\, read
  with state RERA rules\; e.g. Goa RERA circular F.No.3/RERA/Off.Matters/20
 19/40 dated 10-01-2020\nIf 30 days late: Penalty up to 5 percent of estima
 ted project cost (Section 60 RERA Act)\nSource: https://rera.goa.gov.in/Co
 mmonimage?IMG_PATH=5/0WkPfo5LroVL2qNvJBHg==\nDetails: https://dgomesbr.git
 hub.io/india-compliance-calendar/o/other-rera-annual-audit-form5/\nInforma
 tion only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-rera-annua
 l-audit-form5/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA FORM 5 due - FY 2027-28
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA FORM 5 due - FY 2027-28
TRIGGER:-P1D
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:other-rera-quarterly-update@FY2028-29-Q2@india-compliance-calendar
DTSTAMP:20261016T044807Z
DTSTART;VALUE=DATE:20281015
DTEND;VALUE=DATE:20281016
SUMMARY:RERA QPR due - Q2 FY 2028-29 (Jul-Sep)
DESCRIPTION:RERA quarterly project update by promoter - Q2 FY 2028-29 (Jul-
 Sep)\nProjected from the standing rule\; confirm closer to the date.\nLaw:
  Section 11(1)\, Real Estate (Regulation and Development) Act 2016\, read 
 with state RERA rules and regulations (e.g. rule 14\, Haryana Real Estate 
 (Regulation and Development) Rules 2017 and HRERA Gurugram (Quarterly Prog
 ress Report) Regulations 2018)\nIf 30 days late: Penalty up to 5 percent o
 f estimated project cost (Section 61 RERA Act)\nSource: https://haryanarer
 a.gov.in/regulations/Quarterly_Progress_ReportGURUGRAMRegulations2018.pdf\
 nDetails: https://dgomesbr.github.io/india-compliance-calendar/o/other-rer
 a-quarterly-update/\nInformation only\, not legal advice.
URL:https://dgomesbr.github.io/india-compliance-calendar/o/other-rera-quart
 erly-update/
CATEGORIES:Other regulators
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA QPR due - Q2 FY 2028-29 (Jul-Sep)
TRIGGER:-P7D
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:RERA QPR due - Q2 FY 2028-29 (Jul-Sep)
TRIGGER:-P1D
END:VALARM
END:VEVENT
END:VCALENDAR